• Guests may view all public nodes. However, you must be registered to post.

BAE Systems cuts ribbon for $250M Jacksonville ship lift and land level facility

william

Power Poster IV
Donator
Major Contributor
Joined
Mar 3, 2021
The complex will feature a state-of-the-art shiplift system built by Pearlson Shiplift Corporation. The lift’s 492-foot by 110-foot articulated platform can easily accommodate a Flight III U.S. Navy guided missile destroyer or a commercial vessel displacing about 25,000 tons and accommodate multiple vessels for maintenance simultaneously ashore, the new complex expands the shipyard’s capabilities threefold.
 
Back
Top Bottom