France’s nuclear regulator has opened a 15 day public consultation, 11-26 Nov, on a draft decision to authorize commissioning of the “Atelier de maintenance des conteneurs 2” at Orano Tricastin, INB 178-U. The workshop handles washing of UF6 transport and storage cylinders.
NOTE: Official ASNR consultation with draft decision and technical opinion posted. Routine licensing step, not an incident.

