Turkey’s Akkuyu Nuclear Power Plant is moving deeper into the commissioning runway. Anadolu reports Unit 1 is in final pre-operational prep, including equipment/system checks, primary circuit hydraulic test prep, imitation fuel loading, and hot/cold testing coordination with Turkish nuclear authorities.
